Skip to content
Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Westfield Century City

10250 Santa Monica Blvd
Los Angeles CA 90067

Contact Sheet

Center Information

Project Manager - Tenant Coordinator Gary Wooller
+1 (310) 407-7841
gary.wooller@urw.com
Director - Retail Design Alfonso Zavala
+1 (310) 689-3921
alfonso.zavala@ext.urw.com
Property Address
Westfield Century City
10250 Santa Monica Blvd.
Los Angeles 90067

 

Delivery Address
Westfield Century City
10250 Santa Monica Blvd.
Los Angeles 90067

Century City Images

Century City is proud to partner with the best retailers in the finest locations. With over 35 centers nationwide, Westfield is always excited to showcase the newest additions to our properties, from kiosks to retail shops to large restaurants and entertainment centers. Here are some examples of our recent tenant buildouts.

  • Storefront Height – Varies per zone. See attached Plan. All measurements are to be verified in field:
Zone 1 – Type 1 (Level 1): 14’-0” Zone 1 – Type 5 (Level 1): 14’-0” Zone 2 – (Level 1): 13’-2”
Zone 1 – Type 2 (Level 1): 15’-6” Zone 1 – Type 6 (Level 1): 14’-8” Zone 3 – (Level 1): 14’-0”
Zone 1 – Type 3 (Level 1): 12’-10” Zone 1 – Type 7 (Level 2): 15’-0” Zone 4 – (Level 1): 14’-0”
Zone 1 – Type 4 (Level 1): 16’-4” Zone 1 – Type 8 (Level 2): 14’-0” Zone 5 – (Level 2): 19’-0”
  • Glass Height – 14ft is typical but will vary. All tenants are required to include an element of full height glazing in their flagship quality storefront.
  • Door Height – 10ft minimum throughout the center.
  • Design Control Zone – Entire customer area. See Retail Design Criteria for more details.
  • Transparency Percentage – A minimum of 60% transparency is required through to the sales area.
  • Signage Height – Signage size and location is reviewed as part of the overall storefront design. See Retail Design Criteria for more details.
  • Blade Signage – not permitted anywhere in the center.
  • Window Signage – Secondary signage not permitted on the storefront but is allowed set back from the storefront or on the demising walls.
  • Bulkhead Conditions – Storefront header details vary between storefront zones. See Retail Design Criteria for more details.
  • Neutral Pier Conditions – Details vary between storefront zones. Most common is an 8”x2” blackened metal neutral pier that sits forward of the lease line and the storefronts tuck in behind. See Retail Design Criteria for more details.
  • Mechanical system type – Chilled water loop in the development sections. Split systems and rooftop units for West mall.
  • Electrical conditions – 277/480 -3ph 4 wire power.
  • Smoke Evac – None.
  • Standard length of process – For the development, all tenant are required to use our appointed permit expeditor. Once operational the permit time will average 8-10 weeks.
  • Need Landlord approved drawings to submit? – Yes.
  • Pre-con is required – Yes. Tenant GC to set up meeting with the Tenant Coordinator during the development or the Facilities Manager once operational prior to start.
  • GC required for permit issuance – Yes.
  • Union Site – During development only carpentry trades are required to be union. Open shop once operational.

Floor Plans

Additional Information