Mission Valley

Mission Valley

1640 Camino Rio North
San Diego, CA 92108

Mission Statement

Westfield Mission Valley is situated in the geographical center of San Diego County in the densest 3 miles of retail real estate south of LA. A powerhouse mall generating almost half a billion dollars in total sales volume, Mission Valley is home to numerous #1 stores for national retailers and serves a dense trade area which includes the affluent residents of Mission Hills, 40,000 college students within 6 miles, 500,000+ daytime office workers and tourists and conventioneers staying at the adjoining hotel circle offering a choice of some 5,700 hotel rooms.

Contact Sheet

Center Information

Tenant Coordinator Bob Vander Linden
415-527-7471
bob.vanderlinden@urw.com
Regional Project Coordiantor Kelly Wells
310-445-2461
kelly.wells@urw.com
Leasing Jason Woods
619-544-8181
jason.woods@urw.com
Leasing Koy Nichols
619-544-8130
koy.nichols@urw.com
Leasing - Kiosk Daleanna Miller
619-544-8112
daleanna.miller@urw.com
Leasing Administrative Support Sonia Macias
619-544-8140
sonia.macias@urw.com
Leasing Coordinator Andrea Heredia
619-544-8138
andrea.heredia@urw.com
General Manager Diana Grasso
619-296-6375
diana.grasso@urw.com
Facilities Manager Jordan Deitrick
619-849-6609
jordan.deitrick@urw.com
Property Address
Mission Valley
1640 Camino Rio North
San Diego, CA 92108

 

Delivery Address
Mission Valley
1640 Camino Rio North
San Diego, CA 92108

Mission Valley Images

Mission Valley is proud to partner with the best retailers in the finest locations. With over 35 centers nationwide, Westfield is always excited to showcase the newest additions to our properties, from kiosks to retail shops to large restaurants and entertainment centers. Here are some examples of our recent tenant buildouts.

  • Storefront Height – Varies per zone. See attached Plan Zone 1- 12’-10”
Zone 1- 12′-10″
Zone 2- 10′-0″
Zone 3- 17′-11″
  • Glass Height – 10ft nominal except in zone 2
  • Glass Door Height – 10ft standard except in zone 2.
  • Design Control Zone – 5ft hard lid, hard surface flooring, concealed track lighting
  • Transparency Percentage – Exact number (80% glass, 20% opaque).
  • Signage Height – (10ft min height, face-lighted no trim cap, reverse channel halo or illuminated push through letters)
  • Blade Signage – not permitted in main concourse –15”x 33”x 3”d 10ft AFF to top of sign, allowed at ancillary wings only. See attached Zone Plan)
  • Window Signage – if used 3” frosted or 3M lm applied to inside face of window installed at 36”AFF
  • Neutral Pier Conditions – 6” stainless steel finish.
  • Mechanical system type – Mall central plant for cooling and heating with Tenant supplied Fan coil units and ducted return. Toilet exhaust by Tenant
  • Electrical conditions – Mostly 120/208 – 3ph power. Some 277/480 -3ph power with transformer required.
  • Smoke Evac – None
  • Standard length of process – Permit time is average 6- 8 weeks (approx. 6 weeks with Private Provider)
  • Need Landlord approved drawings to submit – Yes
  • Pre-con is required – Tenant GC to set up meeting with Facilities Manager prior to start.
  • GC required for permit issuance.
  • Union – no, unless under development.

Floor Plans

Additional Information