Westfield Old Orchard

4905 Old Orchard Center, Suite 060 Skokie, IL 60077

Contact Sheet

Center Information

Director - Retail Design Tricia Zeitler
+1 (201) 221-0416
tricia.zeitler@urw.com
Project Manager - Tenant Coordination Jinyoung Jang
+1 (872) 227-4067
Jinyoung.Jang@urw.com
Property Address
Westfield Old Orchard
4905 Old Orchard Center, Suite 060
Skokie, IL 60077

 

Delivery Address
Westfield Old Orchard
4905 Old Orchard Center, Suite 060
Skokie, IL 60077

Westfield Old Orchard Images

Westfield Old Orchard is proud to partner with the best retailers in the finest locations. With over 35 centers nationwide, Westfield is always excited to showcase the newest additions to our properties, from kiosks to retail shops to large restaurants and entertainment centers. Here are some examples of our recent tenant buildouts.

  • Storefront Height – Exact height (14’-20’ depending on zone requirement)
  • Glass Height – Exact height (10’-14’ depending on zone requirement)
  • Glass Door Height – Exact height (10’)
  • Design Control Zone – Exact depth (10’) hard lid, hard surface flooring, concealed track lighting
  • Transparency Percentage – Exact number (80% glass, 20% opaque).
  • Signage Height – Exact max height (18” max letter, no trimcap, raceways, or box signs.)
  • Blade Signage – required and design specific to Tenant Criteria Manual.
  • Bulkhead Conditions – Varies upon zones (remove existing canopy and install Tenant Designed Canopy or no bulkhead) see zones in Criteria
  • Neutral Pier Conditions – Depending on location, existing or new to mall criteria per zone.
  • Materials – Exterior grade materials (no natural stone at base of storefront)
  • Canopies – Tenant furnished & installed canopies required in some zones.
  • Mechanical system type – Chilled / Hot Water – unless restaurant can be RTU
  • Electrical conditions – 277/480
  • Smoke Evac – None
  • Standard length of process – Permit time is average 4 weeks, can be 2 with paid overtime
  • Need Landlord approved drawings to submit? – YES
  • Precon is required – Tenant GC to set up meeting with Facilities Manager prior to start.
  • GC required for permit issuance.
  • Union

Floor Plans

Additional Information

Skip to content